Botley Hill

Aztec were invited to construct a replacement facility for weddings and leisure on the site of a temporary structure with challenges.

Read more »

Mileway

The project involved providing a new built up metal roof in an occupied facility on a tight time frame.

Read more »

LIPA

The project required creating additional highly serviced, high-performance space within Grade 2* listed higher educational buildings, in a conservation area and overlooked by Grade 1 Anglican Cathedral.

Read more »

Yanco – Estuary Business Park

Full Design and build project to create a new 45,000 square foot factory and offices by linking ten newly built industrial units together. 

Read more »

Society of St Pius X Church

Ecclesiastical projects require a sensitive approach, handled by a team with experience handling heritage structures and an understanding of the challenges such buildings pose.

Read more »

Redwood Distribution

Aztec were appointed to deliver a brand new industrial facility on behalf of our Redwood, enhancing their operational offering by 100%.

Read more »

Parbold Douglass School

To avert future flooding to a school that had suffered serious flooding twice and increased near misses due to the topography and soil type of the site.

Read more »

Pelham Grove

AZTEC were invited to deliver a cost plus contract in order to achieve an exacting and high-end specification that delivered precise levels of detail for a sensory space.

Read more »